A battery can be added to a home on the Feed-in Tariff without losing eligibility for FIT generation payments, provided the generation meter still measures only electricity from the accredited panels and the FIT licensee is told about the change. The simplest layout leaves the original solar inverter and generation meter in place and connects the battery after them.
Export payments depend on two things: whether exports are deemed or metered, and whether the battery can charge from the grid. Those answers decide what changes when solar panel battery storage is added, and the same checks apply to home battery storage installed alongside FIT-accredited solar panels in Great Britain, where the FIT scheme applies.
What the FIT rules require
A FIT installation can keep its eligibility for payments when solar panel battery storage is added, as long as generation, and export where it is metered, can still be measured accurately. Ofgem’s guidance on co-located storage sets out how that applies in practice.
The generation meter
Generation payments depend on a meter that records electricity from the FIT panels and nothing else. Ofgem accepts storage connected after the generation meter, storage before it that can only be charged by the FIT installation, or a bi-directional meter that isolates the installation’s output. If storage before the meter can charge from the grid and the meter cannot isolate the panels’ share, generation payments cannot be made.
In Ofgem’s guidance, a bi-directional meter measures input and output and calculates a net value, and most smart meters do not meet that definition. Whichever option applies, the single-line diagram has to show the metering path.
Telling the FIT licensee
The FIT licensee, the supplier that makes the FIT payments, must be notified when battery storage is connected. For ROO-FIT installations, the generator must also notify Ofgem by updating the Renewable Electricity Register (RER). MCS-FIT generators only need to notify their FIT licensee. Ofgem’s guidance requires an updated single-line or schematic diagram showing the battery connection and metering arrangements, details of the meter readings used for FIT payments, and information about the storage system and its commissioning date. MCS-FIT generators must also submit the relevant battery storage installation declaration forms to their FIT licensee. ROO-FIT generators must provide the required information to Ofgem as well. Ofgem gives no advance approval, and Ofgem or the licensee can ask for more information afterwards.
Choosing how the battery connects
For home battery storage uk installers propose for FIT households, the connection layout determines which metering checks are needed. The battery either works alongside the existing inverter or takes over the panels through a hybrid one.
Battery after the generation meter
The original inverter and generation meter stay in place, and the battery system connects on the household side of the meter. This matches the first scenario in Ofgem’s guidance: the generation meter measures only the panels, so the generation reading is unaffected. Grid charging then matters mainly for metered export and the SEG.
Panels moved to a hybrid inverter
Connecting the existing panels to the solar inputs of a hybrid inverter, such as EcoFlow OCEAN 2 Plus Single-Phase, puts the battery before the generation meter. When existing panels are moved to a hybrid inverter, the battery may sit before the generation meter. FIT generation payments can still continue if the battery cannot charge from the grid or an approved bi-directional generation meter can isolate the eligible PV output. However, battery charging and discharging losses may reduce the generation recorded. Metered export payments require a separate assessment of whether the export meter can identify eligible FIT electricity.
New panels on spare inputs earn no FIT payments. If they share metering with the accredited panels, the licensee has to confirm how eligible generation and export are identified or apportioned.
An existing inverter on the backup side
EcoFlow OCEAN 2 Plus Single-Phase also supports third-party inverter connections on its backup side, which may let a compatible existing inverter stay in use. The installer still has to check the inverter model and operating modes, including behaviour in a power cut, and show that the generation meter measures only the panels’ output.
What happens to export payments
The effect on export income depends on how exports are paid now and whether the battery can charge from the grid, and the licensee confirms each outcome.
Deemed export
Homes without an export meter usually receive deemed export payments, a fixed percentage of the generation meter reading. Ofgem’s guidance says deemed export remains available with storage where that meter measures only the installation’s output, but a battery does not by itself settle eligibility. A smart meter installed at the same time can move the account to metered export.
Metered export and the SEG
Metered FIT export relies on a reading that covers only the installation’s exports. Once a battery can charge from the grid, an ordinary export reading also includes grid electricity sent back, so the metering and operating arrangement has to be assessed. The same issue applies under the Smart Export Guarantee, which FIT generators can join after opting out of FIT export payments.
| Export arrangement | Battery charged only by the panels | Battery able to charge from the grid |
|---|---|---|
| Deemed FIT export | Can continue if deemed-export eligibility is still met | Can continue if eligibility is met and the generation meter measures only the panels |
| Metered FIT export | Can continue if the export meter records only FIT exports | A mixed export reading cannot be relied on |
| SEG after opting out of FIT export | Battery exports can count as eligible | Licensee not obliged to pay on a mixed export reading |
Grid connection, VAT and paperwork
A battery inverter added beside an existing solar inverter raises the total rating at the property, so the installer confirms which G98 or G99 procedure applies to the specific model and layout. For home battery storage in the UK, that connection step is separate from the FIT notification and runs alongside it.
Qualifying battery installations in homes, including batteries retrofitted to existing panels, have been zero-rated for VAT since 1 February 2024, and HMRC guidance applies the zero rate until 31 March 2027. The FIT statement, MCS certificate and meter details help the installer draw the new schematic. In England and Wales the electrical work also has to meet Part P.
Weighing a battery against the remaining FIT years
FIT payments for solar installations with an eligibility date from 1 August 2012 last 20 years, and earlier installations have longer terms, so many homes still have years of payments left. A battery connected after the generation meter does not change the generation reading, so the value of solar panel battery storage comes from using more of the panels’ output at home and, where the setup allows, from cheap-rate grid charging.
Where deemed export remains available and the generation reading is unchanged, storing surplus solar may not reduce export payments, although the import saving depends on the electricity delivered after storage losses. On metered export or the SEG, the export income given up has to be set against the import cost actually avoided. Generation readings and bills from before installation give a baseline for judging the result.
Before booking the installation
Before home battery storage in the UK is fitted to a FIT installation, it is worth asking the FIT licensee, and any SEG company, how the planned layout will be treated. A schematic with the battery’s connection point, each meter’s position and whether the battery can charge from the grid tells them which payments solar panel battery storage leaves in place and whether the metering or export arrangements need to change.